407 Determinations match your query
Show detailed results

2026/043: Regarding the compliance of a retaining wall and associated sitework with Clause B1 Structure

This determination relates to the construction of a new blockwork retaining wall and associated sitework. It considers three matters: whether the retaining wall and associated site work complies with Clause B1 Structure as it relates to other property, the authority’s decision to issue a code compliance certificate for the building work, and the authority’s alleged failure to issue a notice to fix in relation to the building work.

About this document

2026/042: Regarding a proposed change of use from former Plunket Rooms to a residential dwelling

This determination considers an authority’s decision to refuse to provide a written notice for a change of use under section 115 of the Building Act due to concerns regarding the structural performance of the existing building.

About this document

2026/038: An authority’s decision to issue a notice to fix for building work to an apartment deck

This determination relates to a notice to fix where the authority considered that work on a Unit’s existing deck and door threshold, and the installation of a new rainwater head and downpipe from the deck, undertaken without a building consent, was building work regulated under the Building Act. The determination also considers the content of the notice to fix.

About this document

2026/036: Regarding the compliance of a modular dwelling with Clauses B1, B2, E1, E2, E3, and G9

This determination considers the compliance of a modular dwelling constructed partly offsite and partly at the owners’ property under two separate building consents granted by two authorities. The determination discusses the compliance of the as-built work with several clauses of the Building Code, primarily relating to the dwelling’s structure, weathertightness, gutters, bathroom linings, and electrical fixtures.

About this document

2026/025: An authority’s decision to issue a code compliance certificate for a dwelling and shed

This determination arises from the authority’s identification that a code compliance certificate had been issued in error because a portion of the building work detailed in the building consent had not been constructed at the time the certificate was issued. 

About this document

2026/023: An authority’s decision to refuse to issue a notice to fix for building work to construct a retaining wall

This determination concerns an authority’s decision to refuse to issue a notice to fix for building work associated with a retaining wall. The determination considers whether the building work (including sitework) carried out on the boundary of several properties complies with clause B1.3.6 of the Building Code as it relates to avoiding the likelihood of damage to other property.

About this document

2026/018: The authority’s decision to grant a building consent in relation to the importance level of a building being structurally strengthened

This determination considers the authority’s decision to grant a building consent for seismic structural strengthening work on a commercial building where the building has been considered as Importance Level 2 in terms of structure. The determination considers whether there are any factors that would make it instead Importance Level 3.

About this document

2026/014: An authority’s proposed decision to refuse a building consent with the reasons relating to the compliance of the bracing design with B1/AS1

The determination considers the authority’s proposed decision to refuse a building consent in relation the bracing design in a new dwelling. In making the determination, it will consider the reasons for the refusal about whether the compliance pathway for the design of the bracing is Acceptable Solution B1/AS1.

About this document

2026/007: The issue of a building consent, failure to issue a notice to fix, and compliance of proposed work with Clause B1

This determination relates to the construction of a new residential building. The determination considers three matters: the issue of a building consent, whether the authority failed to exercise a power of decision to issue a notice to fix, and compliance with Clause B1 Structure of proposed remedial building work.

About this document

2026/002: An authority’s decision to issue a code compliance certificate for alterations to a kura building

This determination considers an authority’s decision to issue a code compliance certificate for alterations to a block of kura classrooms. The determination considers whether certain building elements comply with the building consent and/or the Building Code.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: