2024/053: An authority’s decision to grant a building consent under section 72 on land that is subject to a natural hazard

Note: This decision was partly confirmed on appeal to the District Court. See Tauranga City Council v Wadell [2026] NZDC 7006.

Read the appeal judgment

This determination considers the authority’s decision to issue a building consent under section 72 for alterations to a dwelling on a property that is subject or likely to be subject to the natural hazard of inundation by flooding.

It considers whether adequate provision to protect the land for flooding has been made.

About this document

BuiltReady guide - Manufacture only

This step-by-step guide shows how the building consent process works for a manufacturer certified to manufacture only.

Contact us

We are here to help you understand your roles and responsibilities throughout the building process and ensure your project meets New Zealand building regulations. If you have any questions, please get in touch.

2022/008: Compliance of a timber retaining wall with Building Code clauses B1 Structure and E1 Surface Water that provide protection of other property

This determination considers whether building work to construct a new retaining wall close to the boundary between two properties complies with Building Code clauses B1 Structure and E1 Surface water that have the purpose of protecting other property.

About this document

Siting and location

Access tips on understanding your build site and surrounding location

2021/004: Regarding the proposed decision to grant a building consent conditional on a natural hazard being recorded on the property title

This determination discusses the correct interpretation of the natural hazards provisions in the Building Act (sections 71 to 74). It considers whether measures to mitigate a rockfall natural hazard constitute “adequate provision” to protect the land and buildings from the hazard.

About this document

2015/015: The refusal to issue a code compliance certificate for a 16 year-old house with monolithic and brick veneer claddings

Discussed whether the building work complied with the Building Code current at the time the consent was issued and whether a code compliance certificate should be issued. Also discussed requirements for energy work certificates under section 94(3) of the Act, and producer statements.

About this document

Weather files for Aotearoa New Zealand

Download free Aotearoa New Zealand weather files to use in energy and hygrothermal building simulation software.

2019/062: Regarding the means of escape from fire from a new dwelling located behind an existing dwelling

This determination concerns a new dwelling constructed at the rear of a site with an existing dwelling, and compliance of the new dwelling in relation to movement to a place of safety in the event of a fire.  The matter at issue is whether the escape route to a safe place for the occupants of the rear dwelling required a protected path past the existing dwelling.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: