Search

Search results

Showing 271-280 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

Acceptable Solutions & Verification Methods

D2 Mechanical installations for access – D2/AS1, D2/VM1, D2/AS2, D2/AS3. Second edition, Amendment 6.

2nd edition, amendment 6

All of the Acceptable Solutions and Verification Methods relating to G1 are contained in one document. G1/AS1 provides a means to show compliance for the number and location of personal hygiene facilities in occupied buildings.   It gives a method to calculate numbers of sanitary fixtures.  It gives design solutions for the means of constructing and installing sanitary fixtures; flushing systems; examples of accessible facilities layouts; cubicles and lobbies. The toilet calculator provides an estimate for numbers of sanitary fixtures.Cited content in this document can be found on the Building CodeHub website.

2025/051: Compliance of an altered retaining wall with B1 Structure and a surface water management system with E1 Surface water

This determination considers whether a retaining wall on two properties complies with the provisions of Building Code Clause B1 Structure following strengthening work and additions, and whether an associated surface water management system complies with Clause E1 Surface water for the protection of other property.

About this document

2018/016: Notice to fix for construction of a shed without building consent

This determination considers whether the authority correctly exercised its powers in issuing a notice to fix for building work carried out without building consent having been obtained.  The matter turns on whether the building work was exempt under Schedule 1 as a repair or replacement of an outbuilding.

About this document

2015/021: Regarding the refusal to issue an exemption under Schedule 1(2) for plumbing and drainage work

Discussed the nature and complexity of building work and the relative competencies of those carrying out the work in relation to whether an exemption for building consent should be granted under Schedule 1(2), and the need for independent quality assurance systems and checks against the Building Code.

About this document

Videos: H1 changes 2026

Watch short videos explaining the upcoming H1 changes and how to meet the new requirements.

C/AS3, amendment 3

C/AS3 (C1-C6) Buildings where care or detention is provided (Risk Group SI). 1st edition, Amendment 3.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people:

Print this page (recommended)

This will print only the current page of this guidance document.

Print this page

Cancel