Search

Search results

Showing 271-280 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

Biennial BCA accreditation reports

The Building (Accreditation of Building Consent Authorities) Regulations 2006 sets the criteria and standards that an applicant must meet to be accredited as a Building Consent Authority (BCA).

2022/005: Compliance of building work with Building Code clauses B1 Structure and E1 Surface Water, that provide protection of other property

This determination considers whether building work to construct an extension to an existing deck, a new retaining wall, and other structures along a boundary between two properties, comply with Building Code Clauses B1 Structure and E1 Surface Water that provide for the protection of other property.

About this document

2019/029: Regarding the compliance of a retaining wall and associated sitework with Clause B1 Structure

This determination is concerned with the compliance of a timber retaining wall with Building Code Clause B1 Structure. The determination considers whether the wall once completed will comply with Building Code Clause B1 Structure, and whether the authority was correct not to issue a notice to fix in relation to the retaining wall.

About this document

Minimum ground snow loads clarified

Technical guidance on determining minimum snow loads, including an update to the Verification Method.

2025/004: Compliance of a step on an access route to a toilet facility

This determination considers the compliance with Building Code Clause D1 Access Routes of an external step to a toilet facility constructed as part of a new warehouse building. 

The determination considers whether the step is on an access route and whether it complies with clause D1.3.3(i).

About this document

2026/014: An authority’s proposed decision to refuse a building consent with the reasons relating to the compliance of the bracing design with B1/AS1

The determination considers the authority’s proposed decision to refuse a building consent in relation the bracing design in a new dwelling.

In making the determination, it will consider the reasons for the refusal about whether the compliance pathway for the design of the bracing is Acceptable Solution B1/AS1.

About this document

Learn about Module 1

This guideline is an overview of the earthquake geotechnical engineering practice series. It includes technical detail about estimating ground motion parameters.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: