2017/016: Decision to issue a building consent for repairs to a multi-storey building

This determination is concerned with the compliance of discrete repairs proposed to the top levels of a multi-storey building. The determination considers whether the authority was correct to issue a building consent for that work, and whether the replacement of a related deck membrane was exempt from requiring a building consent.

About this document

2017/006: Refusal to issue a building consent for the change of use from commercial to residential of one level in a multi-level building

Note: This determination is subject to clarification.


This determination discusses the assessment required under section 115 when there is a change of use to only part of a building, particularly in respect of Building Code clause B1 Structure and whether a detailed seismic assessment is required for the whole building.

About this document

2019/016: Regarding the refusal to amend a building consent for five detached dwellings

This determination considers the modification of a building consent issued for five detached dwellings; four dwellings were completed and one was not.  The owners of the four completed dwellings applied to the authority to modify the consent so the incomplete dwelling and the four completed dwellings each had their own consent, thus enabling a code compliance certificate to be issued in respect of the four completed dwellings.

About this document

2019/013: Regarding the refusal to issue a code compliance certificate for the relocation of and 18-year-old alterations to a house

This determination considers the compliance of consented work for the relocation of an existing building onto a new site and alterations to the building.  The authority refused to issue the code compliance certificate for the work because of concerns over the performance of a membrane roof to a new extension built as part of the relocation consent. 

About this document

2019/004: Decisions to refuse to issue a code compliance certificate and to issue a notice to fix in respect of a solid fuel heater

Note: This determination is subject to clarification

 

This determination concerns an as-installed solid fuel heater installed without the clearance behind it that was described in the manufacturer’s installation instructions.  The determination considers the compliance of heater and a notice to fix issued in respect of this work.

About this document

2018/061: Installation of a replacement wood burner and wetback where a new tempering valve was also installed

This determination considers the installation of a tempering valve to an existing hot water system in a house that was being altered: the alteration involved the replacement of both a wood burner and wetback water heater.  A tempering valve was installed as part of the alteration and the determination considers the compliance of the existing hot water system to the extent required by section 112 of the Act.

About this document

2018/059: Issue of a notice to fix in respect of the compliance schedule and building warrant of fitness for a building

Note: This determination is subject to clarification

 

This determination concerns a notice to fix issued by an authority in respect of the specified systems in a building, the compliance schedule, and the building warrant of fitness. The determination considers whether the notice to fix was correctly issued, the information to be provided in a compliance schedule, and the issue of the building warrant of fitness.

About this document

2018/050: Notice to fix issued for the change of use of a house

This determination considers whether the building has undergone a change of use and the exercise of the authority's powers in issuing a notice to fix for failure to notify the change of use. The determination considers the use category and whether compliance requirements in the new use are additional or more onerous than the requirements related to the old use.

About this document

2018/042: Refusal to issue a code compliance certificate for a viewing platform

This determination considers the compliance of a viewing platform and associated parking with Clause D1 Access routes, and whether an access route to the platform for people with disabilities was needed. The determination also considers whether the gravel access track and car parking provide reasonable and adequate access in terms of Clauses D1 and B2 Durability.

About this document

2018/041: Building consent for a conference centre and the use of large building components prefabricated offshore

This determination considers the authority’s refusal to grant a building consent in relation to a structure that uses large building components prefabricated offshore. The determination discusses what is and is not “building work” in relation to the scope of building consents that use prefabricated components, as well as authority’s abilities to assess compliance of components that are prefabricated offshore.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: