Search

Search results

Showing 21-30 of 939 results for Frame Protection System and FPS Weathertight System
Sorted by relevancy

Consultation opens on the 2022 Building Code update

Consultation is now open for the 2022 Building Code update, which includes proposals for plumbing and drainage, hollow-core floors and fire safety systems.

Consultation has opened for the review of the building consent system

MBIE is asking for feedback on issues with the current building consent system as the first step in a system-wide review.

Construction and materials

Access tips on different material types and ways of building

Specialist roles for medium-density housing projects

An overview of the specialist roles commonly involved with MDH projects and their typical responsibilities.

New Building Code documents published on 2 November 2023

MBIE has published Building Code updates on plumbing and drainage, protection from fire and structural stability of hollow-core floors.

Have your say on the options for a better consenting system

MBIE is seeking feedback on potential options to improve the current building consent system as part of the second stage in a system-wide review.

An introduction to Acceptable Solution E2/AS1

An introduction to E2/AS, the Acceptable Solution to Building Code clause E2 External Moisture.

State of the Building and Construction Sector report released

The new report has shown the building and construction sector has remained relatively resilient throughout the past 12 months.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: