Search

Search results

Showing 951-960 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

Practice Advisory 15: Improving collaboration in building design

Discusses the importance of collaboration during the design process to improve building outcomes.

2017/044: Refusal to issue a code compliance certificate for a 14-year-old house

This determination is concerned primarily with the compliance of the building envelope to a 14-year-old house with autoclaved aerated concrete cladding. The determination considers the authority’s reasons for refusing to issue the code compliance certificate and whether the house complies with the requirements of the Building Code that was in force at the time the building consent was issued.

About this document

2017/040: Refusal to grant a building consent for proposed supermarket alterations

This determination concerns the refusal to issue a building consent for alterations to an existing supermarket building because it was believed the proposed work did not comply with the fire safety clauses of the Building Code. The determination considers the requirements of the legislation as it applies to the alteration. The fire engineer initially used a verification method to show compliance, and the determination discusses what this method requires.

About this document

2019/058: The durability of steel sub-floor bearers built under building consents issued on the basis of national multiple-use approvals

This determination considers whether galvanised steel bearers used in subfloor framing to four houses meet the required minimum 50-year durability period described in Building Code Clause B2.3.1(a). The building consents for the houses were in respect of work described in national multiple-use approvals issued under section 30F of the Act. The houses have been built and the authority has refused to issue the code compliance certificates for the as-built work because it is of the view the bearers do not comply with Clause B2 Durability.

About this document

Copper water pipe and fittings

Information about the manufacturing standards of copper pipes and fittings in New Zealand.

E Moisture

E Moisture provides for building to manage water. It contains Building Code clauses E1 Surface water, E2 External moisture and E3 Internal moisture.The provisions ensure conditions for healthy, safe and durable buildings. They protect people and other property from the adverse effects of surface water, from penetration by water, and the accumulation of moisture from both the outside and inside.  Adverse effects, for example, include undue dampness, damage or degradation to building elements, condensation, or fungal growth.Record of amendments is a record of changes to the acceptable solutions, verification methods and handbooks.

2006/040: Requirement for a lift in building

N/A

About this document

2015/051: Regarding the issue of a building consent for a 1 year-old house

This determination discusses the approach to be taken in assessing documentation provided in support of a building consent application, and whether the documentation provided in this instance was adequate in terms of the decision to grant consent. The determination also addresses amendments to the consent and the compliance achieved.

About this document

2008/078: Provision of lift access to a unit in an office development

N/A

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people:

Print this page (recommended)

This will print only the current page of this guidance document.

Print this page

Cancel