Search

Search results

Showing 241-250 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

C/AS2, amendment 2

C/AS2 (C1-C6) Buildings with Sleeping (non institutional) (Risk Group SM). 1st edition, Amendment 2. 19 Dec 2013 – 28 Feb 2015.

Weathertightness requirements for garages

Know when a garage needs to meet the weathertightness requirements of Acceptable Solution E2/AS1.

2026/008: The authority’s decision to issue a notice to fix for a building constructed without building consent

This determination considers the authority’s decision to issue a notice to fix for a contravention of section 40 of the Building Act 2004, relating to building work carried out without building consent. The determination focuses on whether the building work required building consent, in particular whether the work was exempt under Schedule 1, clause 3B, with specific consideration of the meaning of “not more than 1 storey” and the relationship between the floor level and the supporting ground.

About this document

2020/030: Regarding the purported refusal to grant a building consent because of a dispute about the importance level of the building

This determination considers the authority's purported refusal to grant a building consent for proposed building work because the authority did not agree with the importance level proposed by the structural engineer. The determination discusses whether the subject building should be classified as Importance Level 2 or Importance Level 3 as set out in Australian/New Zealand Standard 1170.0. This standard is referenced by Verification Method B1/VM1, which is a means of compliance with Building Code Clause B1 Structure.

About this document

2023/005: Regarding the decision to issue a notice to fix for modifications to a shipping container

The matter to be determined, under section 177(1)(b) and (2)(f), is whether the authority was correct in its decision to issue a notice to fix for the owners’ structure. In deciding this matter, I must consider whether the structure was exempt from requiring a building consent under Schedule 1 of the Act, and whether the authority had sufficient evidence to consider on reasonable grounds that the building work did not comply with the Building Code.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people:

Print this page (recommended)