2017/086: Refusal to grant exemption from the requirement to obtain a building consent for recladding a house

This determination considers whether the authority was correct to refuse to grant an exemption under Schedule 1(2) for work to reclad a house. The determination also discusses whether the cladding was likely to be exempt from the requirement for a building consent under Schedule 1(1).

About this document

2022/003: Compliance of proposed alterations to a dwelling by way of Acceptable Solutions B1/AS1 and E2/AS3

This determination considers whether two items of proposed building work comply with the relevant Acceptable Solutions. Item 1 concerns reinforcing bars to reinforce a concrete floor slab and whether the proposal complies with Acceptable Solution B1/AS1 for Building Code Clause B1 Structure. Item 2 concerns the use of a damp-proof membrane as waterproofing for a 1060mm high retaining wall and whether the proposal complies with Acceptable Solution E2/AS3 for Building Code Clause E2 External Moisture.

About this document

2020/032: Regarding the compliance of a soil fixture space without a hand basin with Building Code Clause G1 Personal hygiene

This determination considers the compliance of a soil fixture space which does not contain a hand basin. The determination discusses the term "immediately adjacent" and whether the soil fixture space without a hand basin complies with Building Code Clause G1 Personal hygiene by way of the Acceptable Solution G1/AS1 and if not whether the space complies with Clause G1 as an alternative solution.

About this document

2017/007: Authority's exercise of its powers of decision to refuse to issue a building consent for a new house

This determination considers whether the authority was correct to refuse to issue a building consent on the grounds that it considered the proposed footing detail, which is an alternative solution, did not comply with Clause B1 of the Building Code. The determination compares the proposed footing detail with that set out in the Acceptable Solutions SH/AS1 and B1/AS1 in terms of its flexural and shear capacity.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people:

Print this page (recommended)

This will print only the current page of this guidance document.

Print this page

Cancel