Designers: step-by-step guide to plumbing and drainlaying self-certification

Last updated: 7 September 2026

This guide provides step-by-step instructions to use the self-certification for plumbing and drainlaying scheme. It clarifies roles and responsibilities for designers and explains important steps and considerations.

Step 1: Designer determines whether self-certification may be suitable

The designer will discuss the project with the owner and project team.

Together they will consider whether the proposed plumbing and drainlaying will qualify for self-certification and whether to use this pathway.

Step 2: The work is designed

The designer prepares plans and specifications that:

  • comply with the Building Code
  • clearly identify the proposed self-certifiable plumbing and drainlaying and what will instead go through the building consent authority (BCA) inspection process
  • specify applicable compliance pathways – only plumbing and drainlaying designed to an Acceptable Solution or Verification Method is eligible, unless it’s a qualifying on-site system.

The designer should clearly show which work will be self-certified and which work will be inspected by a BCA.

Step 3: Designer coordinates with practitioners

The designer will work with:

  • endorsed plumbers
  • endorsed drainlayers
  • engineers
  • other designers

to ensure the proposed scope of self-certification is understood.

Step 4: Designer supports the building consent application

In the building consent application, the designer must:

  • describe the work proposed to be self-certified and how it’s intended to be carried out (whether the endorsed plumber or drainlayer will carry out, assist with, or supervise the plumbing and drainlaying)
  • provide the name of the endorsed plumber or drainlayer, if known
  • provide plans and specifications that will meet the requirements of the Building Code.

Step 5: Designer responds to requests for information

If requested by the BCA, the designer should:

  • clarify design details
  • provide additional information, whether it’s about proposed self-certified work or otherwise
  • explain proposed compliance pathways.

Step 6: Design changes are managed

If changes occur during construction, the designer:

  • assesses whether consented drawings need updating
  • supports minor variations or building consent amendment applications where required.

Step 7: Designer updates documentation

Where changes are approved, the designer:

  • revises plans and specifications
  • clearly identifies any changes affecting self-certification.

Self-certification is optional. If plumbing and drainlaying work does not require a building consent, it is not eligible for the scheme. This is because self-certification removes the need for BCA inspections for eligible work listed on the building consent as self-certifiable.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: