2017/050: Refusal to issue a code compliance certificate for a 12-year-old house completed under the supervision of a building certifier

This determination considers the compliance of a 12-year-old house that had been built under the supervision of a building certifier, but where a code compliance certificate had not been issued. The authority had issued a certificate of acceptance for the work, but the current owners were seeking a code compliance certificate in its place. The determination considers which certificate was appropriate to issue in the circumstances.

About this document

2017/044: Refusal to issue a code compliance certificate for a 14-year-old house

This determination is concerned primarily with the compliance of the building envelope to a 14-year-old house with autoclaved aerated concrete cladding. The determination considers the authority’s reasons for refusing to issue the code compliance certificate and whether the house complies with the requirements of the Building Code that was in force at the time the building consent was issued.

About this document

2017/030: Two notices to fix issued in relation to a relocated house and shed

This determination concerns two notices to fix: one issued in relation to foundations and flooring constructed for a shed without building consent and the other for work to reclad a relocated house. The determination discusses the scope of the building work covered by the building consent for the relocated house, the extent of compliance required by the Act, and whether the building work complies.

About this document

2017/025: Access and facilities for people with disabilities to a hypothetical public dive pool

This determinatino considers whether an accessible route is required for a deep water pool that is part of a public swimming pool facilties. The determination discusses the requirement for an accessible route, both in terms of the deep water pool only and also in terms of it being one of a number of pools within the facility, and the normal activities carried out in those pools.

About this document

2017/020: Decision to issue a certificate of acceptance for building work

This determination considers completed remedial work to a house. The work was consented, but work that was intended to be done as an amendment to the consent was completed by the owner before the amendment was approved by the authority. The code compliance certificate issued by the authority excluded the amended work, which was regularised through the issue of a certificate of acceptance. The owner disputed the exclusion of the amended work from the code compliance certificate.

About this document

2017/011: Refusal to issue an amendment to a building consent in respect of the AAC cladding system of a 4-year-old house

This determination is concerned with the compliance of the AAC cladding to a four year old house and the authority's refusal to issue an amendment for repairs and repainting. The determination discusses damage caused by thermal movement due to the dark paint colour, and the authority's request for a producer statement and warranty for the cladding.

About this document

2016/034: Refusal to grant an s72 waiver for two building consents for proposed buildings on land subject to a natural hazard

This determination considers the authority’s refusal to grant a waiver under section 72 of the Act for two proposed buildings which are situated on land subject to a debris flow hazard.  The determination considers the risk to occupants from debris flow events, and the extent to which the proposed work will mitigate this risk.

About this document

2016/029: Regarding the issue of a notice to fix for three cabins constructed without building consent

This determination considers three cabins constructed for the use of sleeping accommodation at an ashram and whether the building work was exempt from the requirement to obtain building consent under Schedule 1. The determination discusses the definition of the term “dwelling” as it relates to Schedule 1(3)(d).

About this document

2018/057: Decision to grant a building consent subject to notification under section 73 for building work on land subject to natural hazards

This determination considers an authority’s decision to grant building consent subject to a section 73 notice requiring a notice to be placed on the land title identifying the land as being subject to natural hazards - being erosion and inundation.  The subject property is adjacent to a river located in a rural setting. 

About this document

2018/035: Refusal to issue a certificate of acceptance and the issue of a notice to fix for alterations to a building

This determination concerns alterations carried out without a building consent and considers the authority's decisions to refuse to issue a certificate of acceptance and to issue a notice to fix.  The determination considers whether the building work was exempt work or was subject to an existing building consent, and discusses the content of the notice to fix and of the notification of refusal.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: