Search

Search results

Showing 81-90 of 867 results for Frame Protection System and FPS Weathertight System
Sorted by relevancy

2020/012: Regarding compliance of building work with Building Code Clause E1 Surface water and the decision to issue a notice to fix in respect of it

This determination considers whether a depression on semi-rural property can be considered a suitable outfall for a surface water drainage system. The authority issued the notice to fix because it considered the drainage system had not been constructed in accordance with the consented plans. The determination considers the compliance of the outfall and whether the authority was correct to issue the notice to fix

About this document

An introduction to Acceptable Solution E2/AS1

An introduction to E2/AS, the Acceptable Solution to Building Code clause E2 External Moisture.

2017/026: Notice to fix issued in respect of a commercial laundromat

This determination was sought by the authority in regards to whether a notice to fix was correctly issued to the designer as a specified person, and whether the sprinkler system is a specified system for the purpose of the compliance schedule and building warrant of fitness.  The determination also considers the compliance of particular features of the building, and discusses the various contraventions listed in the notice to fix.

About this document

2023/037: The compliance of a waterproof membrane tanking system with Clause E2 of the Building Code

This determination considers whether the tanking system, applied to a blockwork retaining wall on a residential house, complies with the weathertightness requirements of Building Code clause E2 External Moisture.

About this document

Building consent system evaluation

We are taking an in-depth look at the building consent system to better understand how it is working and to help identify opportunities for improvement.

New system for building emergency management

In December 2019, the Building Amendment Act will take effect and provide a new system for councils and MBIE to manage buildings during and after emergencies.

Regulation 13 – Ensuring technical leadership

Building consent authorities must have a system to identify employees and contractors who are competent to provide technical leadership.

Building warrants of fitness

Understand BWoFs and the territorial authority’s administration and enforcement role.

Seismic Work Programme

MBIE has established the Seismic Work Programme to consider how National Seismic Hazard Model results should be used within the Building Code.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: