Showing 81-90 of 934 results for Frame Protection System and FPS Weathertight System
Sorted by relevancy

Managing earthquake-prone buildings

Aotearoa New Zealand has a national system for managing earthquake-prone buildings, which came into effect in July 2017.

This system aims to inform owners of earthquake-prone buildings, territorial authorities (local councils), engineers, other building professionals and building users.

2020/034: Regarding the compliance of fire safety precautions in a motel

Note: This determination was subject to appeal. The Determination was confirmed and the appeal was dismissed. Read the appeal judgement.

 

This determination considers the issue of a building consent and code compliance certificate for a motel in respect of a fire alarm system. The matter turns on whether the building work as approved in the building consent complied with Clauses C2 Means of escape from fire and F7 Warning systems, and whether the construction of the motel without a fire alarm system being installed met the performance requirements of those clauses when the code compliance certificate was issued.

About this document

Purpose and objectives of the BCA accreditation scheme

The purpose and objectives of the building consent authority accreditation scheme.

2019/022: Regarding the decision to issue a code compliance certificate in respect of surface water drains to a house

This determination considers the compliance of an as-built surface water drainage system to a new house.  The system as consented did not provide a compliant solution and the work as installed is not considered to be compliant by the building owner.

About this document

Background

MBIE has established the Seismic Work Programme to ensure the building system adapts to new knowledge.

Building consent system evaluation

We are taking an in-depth look at the building consent system to better understand how it is working and to help identify opportunities for improvement.

2017/083: Refusal of code-compliance certificate for house and producer statement for on-site waste water treatment system

This determination considers an authority’s refusal to issue a code compliance certificate for an on-site waste water treatment system because the installer had not provided a producer statement for the completed system.  The determination considers the likely compliance of the completed system.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: