Search

Search results

Showing 71-80 of 867 results for Frame Protection System and FPS Weathertight System
Sorted by relevancy

Summary of submissions published for the Building consent system review: options paper

We recently sought feedback as part of the review of the building consent system. This consultation focused on potential options for improvement to this system.

2016/052: Regarding the compliance of a relief drain from the safety valve to a hot water cylinder in a three-year-old house

This determination considers the compliance of a PVC foul water drainage system to a house where the TPR valve from a hot water cylinder drained into the foul water system.  The hot water cylinder was connected to a solid fuel wetback and a solar water heater as uncontrolled heating sources.

About this document

Earthquake-prone building system review begins

The Government has today published the terms of reference for the review of the earthquake-prone buildings (EPB) system. The Review is now underway and will look at the way Aotearoa New Zealand manages seismic risk in existing buildings.

2017/083: Refusal of code-compliance certificate for house and producer statement for on-site waste water treatment system

This determination considers an authority’s refusal to issue a code compliance certificate for an on-site waste water treatment system because the installer had not provided a producer statement for the completed system.  The determination considers the likely compliance of the completed system.

About this document

2024/041: Regarding the authority’s refusal to grant a building consent for building work to replace the existing fire alarm system in a cool store.

This determination considers the decision by the authority to refuse to grant a building consent for work to disestablish an existing sprinkler system. The authority considered that there were outstanding issues regarding the fire load within the building, the proposed replacement warning system, and the fire rating requirements for the building. The determination discusses the outstanding issues at the time the building consent was refused, and the refusal letter issued by the authority.

About this document

2018/061: Installation of a replacement wood burner and wetback where a new tempering valve was also installed

This determination considers the installation of a tempering valve to an existing hot water system in a house that was being altered: the alteration involved the replacement of both a wood burner and wetback water heater.  A tempering valve was installed as part of the alteration and the determination considers the compliance of the existing hot water system to the extent required by section 112 of the Act.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: