Search

Search results

Showing 301-310 of 939 results for Frame Protection System and FPS Weathertight System
Sorted by relevancy

Territorial authorities and earthquake-prone buildings

Territorial authorities need to consider which seismic risk areas apply and what information they have on buildings.

Proposed modular component manufacturing rules

MBIE is consulting on the introduction of the Modular Component Manufacturers (MCM) Scheme to ensure the scheme is clear, fit for purpose and able to be implemented effectively.

National BCA competency assessment system levels

BCAs can use the national competency assessment system framework to assess their technical building control staff.

Concrete construction

Concrete is a strong, durable, and relatively cheap method of construction.

2015/021: Regarding the refusal to issue an exemption under Schedule 1(2) for plumbing and drainage work

Discussed the nature and complexity of building work and the relative competencies of those carrying out the work in relation to whether an exemption for building consent should be granted under Schedule 1(2), and the need for independent quality assurance systems and checks against the Building Code.

About this document

2024/048: Regarding an authority’s decision to grant a building consent

This determination considers an authority’s decision to grant a building consent regarding building work associated with the relocation of an existing dwelling. The authority believes it granted the building consent in error, and that decision should be reversed, due to concerns that have subsequently arisen with the designs for the onsite surface water and foul water disposal systems.

About this document

Product substitution and variations

Councils need to know if you're planning a product substitution, and will tell you if it's a minor or major variation.

BEAL CodeMark product certification body issued notice of revocation

Following the suspension of BEAL Certification Service Limited (BCS) as a CodeMark product certification body in September, the Joint Accreditation System of Australia and New Zealand has issued BCS with a notice of revocation.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: