Search

Search results

Showing 771-780 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

2023/014: The requirement for a building consent for building work to a relocated building

This determination considers the authority’s decision to require a building consent for work carried out to a relocated dwelling to extend a kitchen into an area that was previously an enclosed veranda and close in an area that was previously the entrance to a back door. The decision turns on whether the building work falls within the scope of building work exempt under clause 15 of Schedule 1 of the Building Act 2004 from the requirement to obtain building consent.

About this document

C6 Structural stability

Structural stability during fire: buildings remain stable during fire (likelihood of failure or collapse).

2018/059: Issue of a notice to fix in respect of the compliance schedule and building warrant of fitness for a building

Note: This determination is subject to clarification This determination concerns a notice to fix issued by an authority in respect of the specified systems in a building, the compliance schedule, and the building warrant of fitness. The determination considers whether the notice to fix was correctly issued, the information to be provided in a compliance schedule, and the issue of the building warrant of fitness.

About this document

2004/58: Building consent for a house on an overland flow path

N/A

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people:

Print this page (recommended)

This will print only the current page of this guidance document.

Print this page

Cancel