2024/037: The authority’s decisions to issue two notices to fix.

This determination considers the authority’s decisions to issue two notices to fix to the owner. The notices were issued in relation to several structures at the owner’s property, as well as sanitary fixtures located in the garage and carport, and for a change of use of the garage. The determination considers whether there were grounds to issue the notices to fix, the form and content of the notices (including the remedies), and the application of section 167 of the Building Act 2004.

About this document

2023/033: Regarding the compliance of, and decisions made by an authority in relation to, encroaching building work

This determination considers compliance of building work that encroached across the boundary between two properties with Building Code Clauses B1 Structure, B2 Durability and C3 Fire affecting areas beyond the fire source. The determination also considers the authority’s decisions to grant the original building consent, an amendment to that consent, and subsequent issue of the code compliance certificate, and the authority’s alleged failure to issue a notice to fix.

About this document

Concrete masonry and weathertightness

Weathertight guidance for designers working on nonframed structural systems such as concrete masonry.

G12 Water supplies

Requires the safe supply, storage, reticulation and delivery of hot and cold water.

2018/064: Regarding whether the fire safety design of a proposed 185m high mixed-use tower building complies with Clauses C1-C6 by means of C/VM2

This determination considers the fire safety design of a proposed tall building and whether compliance with Clauses C1-C6 has been established by means of Verification Method C/VM2.  The determination discusses the scope of the Verification Method, how compliance is established by way of the Verification Method, and the compliance of the proposed design – in particular the lack of isolated interconnection between the lobby containing the designated fire fighters lift and the stair that is the means of egress and which firefighters use to access the floor of fire origin.

About this document

2015/032: Refusal to issue a building consent for remedial work to improve weathertightness issues to a house with a code compliance certificate

This determination covered technical issues about a proprietary system provider’s methodologies and technologies relating to liquid and foaming injection timber treatment systems used to slow the rate of decay. Discussed whether timber treatment process is building work, and whether targeted treatment can be exempt from building consent under Schedule 1 of the Act as maintenance. Discussed impacts on bracing capacity, air volatility, and the use of drying skirts. Also mentioned the provision of new plans as opposed to copied plans.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: