2017/001: Authority's exercise of its powers of decision to issue a notice to fix for building work carried out without building consent

This determination considers building work done without consent to an existing workshop in a commercial building: the building work included installing storage racks and internal partitions, and the installation of sanitary and kitchen facilities. The determination discusses whether the work was exempt from the need to obtain a building consent under Schedule 1 of the Building Act, and whether the building had undergone a change of use.

About this document

C/AS5, amendment 2

C/AS5 (C1-C6) Buildings for business, commercial, low-level storage (Risk Group WB). Amend 2. 19 Dec 2013-28 Feb 2015.

2018/016: Notice to fix for construction of a shed without building consent

This determination considers whether the authority correctly exercised its powers in issuing a notice to fix for building work carried out without building consent having been obtained.  The matter turns on whether the building work was exempt under Schedule 1 as a repair or replacement of an outbuilding.

About this document

2017/077: Whether retaining walls require barriers to comply with Clause F4

This determination considers whether the retaining walls without barriers would comply with Clause F4 Safety from falling. The determination also discusses whether the building work to erect the barriers was exempt from the need for a building consent under Schedule 1.

About this document

2025/051: Compliance of an altered retaining wall with B1 Structure and a surface water management system with E1 Surface water

This determination considers whether a retaining wall on two properties complies with the provisions of Building Code Clause B1 Structure following strengthening work and additions, and whether an associated surface water management system complies with Clause E1 Surface water for the protection of other property.

About this document

2015/021: Regarding the refusal to issue an exemption under Schedule 1(2) for plumbing and drainage work

Discussed the nature and complexity of building work and the relative competencies of those carrying out the work in relation to whether an exemption for building consent should be granted under Schedule 1(2), and the need for independent quality assurance systems and checks against the Building Code.

About this document

C/AS3, amendment 4

C/AS3 (C1-C6) Buildings where care or detention is provided (Risk Group SI). First edition, Amendment 4.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: