Search

Search results

Showing 301-310 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

Learn about Module 1

This guideline is an overview of the earthquake geotechnical engineering practice series. It includes technical detail about estimating ground motion parameters.

2022/005: Compliance of building work with Building Code clauses B1 Structure and E1 Surface Water, that provide protection of other property

This determination considers whether building work to construct an extension to an existing deck, a new retaining wall, and other structures along a boundary between two properties, comply with Building Code Clauses B1 Structure and E1 Surface Water that provide for the protection of other property.

About this document

2019/029: Regarding the compliance of a retaining wall and associated sitework with Clause B1 Structure

This determination is concerned with the compliance of a timber retaining wall with Building Code Clause B1 Structure. The determination considers whether the wall once completed will comply with Building Code Clause B1 Structure, and whether the authority was correct not to issue a notice to fix in relation to the retaining wall.

About this document

2025/018: The authority’s decision to issue a notice to fix for several container and canopy structures that were constructed without building consent

This determination considers the authority’s decision to issue a notice to fix for several container and canopy structures that were constructed without building consent.

The determination considers whether the building work was exempt from requiring a building consent under clause 4 of Schedule 1, which applies to unoccupied detached buildings. The determination also considers the form and content of the notice.

About this document

2021/020: Regarding the refusal to issue a code compliance certificate for 23-year old alterations to a residential dwelling

This determination considers whether an authority was correct to refuse to issue a code compliance certificate for a building consent granted in 1998 under the former Building Act 1991. The determination will discuss the reasons given by the authority for the refusal, and how they relate to Building Code clauses B1 Structure, B2 Durability, E1 Surface Water, and E2 External Moisture that applied in 1998.

About this document

3rd edition, amendment 7

F7 Warning systems – F7/AS1. 3rd edition, Amendment 7. Effective 10 October 2011 - 10 April 2013.

2025/004: Compliance of a step on an access route to a toilet facility

This determination considers the compliance with Building Code Clause D1 Access Routes of an external step to a toilet facility constructed as part of a new warehouse building. 

The determination considers whether the step is on an access route and whether it complies with clause D1.3.3(i).

About this document

B1 Structure

Buildings will withstand likely loads, including wind, earthquake, live and dead loads (people and building contents).

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: