Search

Search results

Showing 221-230 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

C/VM2, amendment 3

C/VM2 Framework for fire safety design (for C1-C6). 1st edition, Amendment 3. Effective 19 Dec 2013 – 28 Feb 2015.

H1 Energy efficiency

Provides for the efficient use of energy and sets physical conditions for energy performance.

C/AS7, amendment 2

C/AS7 (C1-C6) Buildings for vehicle storage/parking (Risk Group VP). 1st ed, Amendment 2. 19 Dec 2013 – 28 Feb 2015.

C/AS3, amendment 2

C/AS3 (C1-C6) Buildings where care or detention is provided (Risk Group SI). 1st ed, Amendment 2. 19 Dec 2013 – 28 Feb 2015.

2017/069: Notice to fix concerning the installation of a solar water heating system

This determination considers a notice to fix issued for the installation of a solar water heating system without building consent being obtained. The matter turns on whether installation of the system including the solar collectors was exempt under Schedule 1.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: