Search

Search results

Showing 151-160 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

2019/035: Regarding the refusal to issue an exemption under Schedule 1(2) of the Act for a proposed horse shelter

This determination considers whether a proposed horse shelter was exempt from the need for a building consent under Schedule 1 of the Act and also whether the authority was correct to refuse to issue an exemption under Schedule 1(2).  The determination discusses what an authority can consider when considering whether to grant a discretionary exemption under Schedule 1(2).

About this document

C/AS5, 1st edition

C/AS5 (C1-C6) Buildings for business, commercial, low-level storage (Risk Group WB). New 10 Apr 2012.

3rd edition, Amendment 5, errata 2

E2 External moisture – E2/VM1, E2/AS1, E2/AS2, E2/AS3. 3rd edition, Amendment 5, errata 2. 24 December 2011.

2018/007: Compliance of door thresholds to a proposed gymnasium in a school

This determination considers the compliance of door thresholds to a proposed gymnasium in a school where the threshold incorporates a change in level of 20mm between the external and internal surfaces.  The determination assesses the detail against the Acceptable Solutions D1/AS1, C/AS4 and E2/AS1 and discusses the terms “stepped threshold”, “weather stop” and “isolated step”.

About this document

Consultation on amending Acceptable Solutions and Verification Methods June 2019 Update

We are seeking your comment on proposals to amend specific Acceptable Solutions and Verification Methods for the June 2019 Building Code update.

An introduction to Acceptable Solution E2/AS1

An introduction to E2/AS, the Acceptable Solution to Building Code clause E2 External Moisture.

Programme of work

The Building Code update work programme outlines the topics being worked on in recent and future consultations. These topics supports other programmes of work such as the seismic work programme, the fire safety review, and making it easier to use overseas building products.

Mesh for reinforcement of concrete slabs-on-ground

Use Grade 500E reinforcing mesh for better ductile performance, reducing damage during earthquakes and ground movement.

3rd edition, amendment 5

E2 External moisture – E2/VM1, E2/AS1, E2/AS2, E2/AS3. 3rd edition, Amendment 5. 1 August 2011.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: