Search

Search results

Showing 41-50 of 397 results
Sorted by recency

2.5 Unoccupied detached buildings for housing fixed plants or machinery (2. Detached, standalone buildings)

Projects & consents > Planning a successful build > Scope and design > Check if you need consents > Building work that doesn't need a building consent > Exempt building work guidance > 2. Detached, standalone buildings > 2.5 Unoccupied detached buildings for housing fixed plants or machinery >
Certain unoccupied buildings that don't normally pose a safety risk don't require a building consent.

2.3. Single-storey detached buildings up to 30sqm in floor area with prefab or kitset components (2. Detached, standalone buildings)

Projects & consents > Planning a successful build > Scope and design > Check if you need consents > Building work that doesn't need a building consent > Exempt building work guidance > 2. Detached, standalone buildings > 2.3. Single-storey detached buildings up to 30sqm in floor area with prefab or kitset components >
This exemption allows for single-storey buildings of up to 30sqm if kitset or prefabricated with an engineer's sign-off.

2.1 Single-storey detached buildings not exceeding 10 square metres (2. Detached, standalone buildings)

Projects & consents > Planning a successful build > Scope and design > Check if you need consents > Building work that doesn't need a building consent > Exempt building work guidance > 2. Detached, standalone buildings > 2.1 Single-storey detached buildings not exceeding 10 square metres >
A building consent is usually not required for small buildings such as garden sheds, cabins and sleepouts.

1.5 Removal of structures (1. General alterations, maintenance and removal)

Projects & consents > Planning a successful build > Scope and design > Check if you need consents > Building work that doesn't need a building consent > Exempt building work guidance > 1. General alterations, maintenance and removal > 1.5 Removal of structures >
This exemption allows for the removal of building work where the design was carried out by an engineer.

1.4 Removal of building element (1. General alterations, maintenance and removal)

Projects & consents > Planning a successful build > Scope and design > Check if you need consents > Building work that doesn't need a building consent > Exempt building work guidance > 1. General alterations, maintenance and removal > 1.4 Removal of building element >
Removing an element from a building up to 3 storeys high may not require a building consent.

1.2 Interior alterations to existing non-residential building (1. General alterations, maintenance and removal)

Projects & consents > Planning a successful build > Scope and design > Check if you need consents > Building work that doesn't need a building consent > Exempt building work guidance > 1. General alterations, maintenance and removal > 1.2 Interior alterations to existing non-residential building >
A building consent is usually not required for internal alterations to a non-residential building.

Calculator for toilet pans, basins and urinals

Building Code compliance > G Services and facilities > G1 Personal hygiene > Calculator for toilet pans, basins and urinals >
Use this calculator to work out how many toilet pans, basins and urinals are required in a building.

Notes for Retaining walls: 13.2-13.3 (13. Support structures)

Projects & consents > Planning a successful build > Scope and design > Check if you need consents > Building work that doesn't need a building consent > Exempt building work guidance > 13. Support structures > Notes for Retaining walls: 13.2-13.3 >
Before you start on a retaining wall, check if you need the help of a Chartered Professional Engineer.

Video overview of the latest building consent exemptions

Video overview of the latest building consent exemptions >
Video overview of the latest building consent exemptions

November 2020 Amendments to C/AS2 and C/VM2 (Fire performance of external wall cladding systems - Revision 2: 2020)

Building Code compliance > C Protection from fire > C1 Objectives of Clauses C2 to C6 > Fire performance of external wall cladding systems - Revision 2: 2020 > November 2020 Amendments to C/AS2 and C/VM2 >
External wall cladding system tests on large or intermediate scale and cladding material tests on small scale.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: