Acceptable Solutions and Verification Methods (AS and VMs) were called compliance documents. Some still have the “compliance document” title but the AS or VMs they contain are valid and unaffected by the name change.
C/AS7, amendment 3
Effective on 1 July 2014 until 30 May 2017
Overview
Acceptable Solution for Buildings used for vehicle storage and parking (Risk Group VP) for compliance with Building Code Clauses C1-C6 Protection from fire.
Scope of Acceptable Solution C/AS7 is restricted to Risk Group VP. This includes buildings used for car parking, service vehicle and unloading areas, and care storage warehouses.
C/AS7 (C1-C6) Buildings used for vehicle storage and parking (Risk Group VP). First edition, Amendment 3. Effective 1 July 2014.