Search

Search results

Showing 781-790 of 1000 results for consent exemption
Sorted by relevancy

Self-certification schemes

Self-certification schemes intend to streamline the building consent system. Learn about how the schemes will work, who can apply, and the responsibilities of everyone involved.

Programme of work

The Building Code update work programme outlines the topics being worked on in recent and future consultations. These topics supports other programmes of work such as the seismic work programme, the fire safety review, and making it easier to use overseas building products.

2015/022: Authority's refusal to grant a modification of clause 3.4a of the Building Code in respect of materials used for internal surface linings

Discussed as title and whether a comparison to the wharenui (marae buildings) exemption is appropriate. Also provides a general framework for modifications or waivers under section 67 of the Act, and methodology for deciding whether it is “reasonable” to grant a modification, for example, by reviewing the extent and possible consequence of the non-compliance with a specific performance clause, or reviewing for consistency with the purpose and principles of the Building Act.

About this document

2019/051: Regarding provision of access and facilities for people with disabilities to an existing house being used to accommodate seasonal workers

This determination considers an authority's refusal to consent to a change of use for an existing building intended to be used as seasonal worker accommodation, on the basis that the building does not make reasonable and adequate provision for access and facilities for people with disabilities. The determination considers the authority's reasons for the refusal and the interrelationship between the change of use provisions and the requirement to provide access and facilities for persons with disabilities to and within buildings. Note: The decision of this Determination was upheld on appeal to the District Court. See: CIV-2019-070-001005 - Western BOP DC v Limmer & NZ Kiwifruit Growers Inc.pdf

About this document

A3 Building importance levels

Sets levels to describe risk and structure factors for the purposes of clauses C1 – C6 Protection from fire.

D1 Access routes

Safety of entry/exit to the building and the safety of any internal or external stairs.

2026/030: Compliance of a Unit without a Type 4 fire alarm system

This determination considers whether a two-level Unit, in an existing commercial building, would comply with the Building Code without a Type 4 alarm system. The existing alarm system was installed as part of a building consent application, after an intermediate floor in the unit was enlarged in area. The determination considers whether the evacuation time allows occupants to move to a place of safety in the event of fire.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people:

Print this page (recommended)

This will print only the current page of this guidance document.

Print this page

Cancel