2023/037: The compliance of a waterproof membrane tanking system with Clause E2 of the Building Code

This determination considers whether the tanking system, applied to a blockwork retaining wall on a residential house, complies with the weathertightness requirements of Building Code clause E2 External Moisture.

About this document

2017/069: Notice to fix concerning the installation of a solar water heating system

This determination considers a notice to fix issued for the installation of a solar water heating system without building consent being obtained. The matter turns on whether installation of the system including the solar collectors was exempt under Schedule 1.

About this document

Seismic Work Programme

MBIE has established the Seismic Work Programme to consider how National Seismic Hazard Model results should be used within the Building Code.

Earthquake-prone building system review begins

The Government has today published the terms of reference for the review of the earthquake-prone buildings (EPB) system. The Review is now underway and will look at the way Aotearoa New Zealand manages seismic risk in existing buildings.

2016/052: Regarding the compliance of a relief drain from the safety valve to a hot water cylinder in a three-year-old house

This determination considers the compliance of a PVC foul water drainage system to a house where the TPR valve from a hot water cylinder drained into the foul water system.  The hot water cylinder was connected to a solid fuel wetback and a solar water heater as uncontrolled heating sources.

About this document

Glazing and glass options

Invest in high-performing windows to reduce heat loss and keep your home warm, dry, and healthy.

2024/041: Regarding the authority’s refusal to grant a building consent for building work to replace the existing fire alarm system in a cool store.

This determination considers the decision by the authority to refuse to grant a building consent for work to disestablish an existing sprinkler system. The authority considered that there were outstanding issues regarding the fire load within the building, the proposed replacement warning system, and the fire rating requirements for the building. The determination discusses the outstanding issues at the time the building consent was refused, and the refusal letter issued by the authority.

About this document

BCTRAG August 2019 meeting

Summary and materials of the 29 August 2019 meeting of the Building Code Technical Risk Advisory Group (BCTRAG).

Product assurance in the New Zealand building market

If you make, import or supply a building product or system you need to provide evidence and information about it.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: