Search

Search results

Showing 501-510 of 934 results for Frame Protection System and FPS Weathertight System
Sorted by relevancy

Regulation 8 – Ensuring enough employees and contractors

Building consent authorities need a system to ensure they have sufficient employees and contractors to perform their building control functions.

National BCA competency assessment system levels

BCAs can use the national competency assessment system framework to assess their technical building control staff.

2016/032: Regarding the use of existing drains for a new dwelling

This determination considers a requirement put in place after a building consent was issued to replace existing drains on a property where a new dwelling was being constructed.  The decision turns on the means of compliance stated in the building consent and the authority’s powers after the consent was issued.  The determination also discusses the Building Code obligations that apply in regards to drainage systems and the performance requirements and assessment of existing drains.

About this document

Product Certificate register

The Product Certificate register has moved to Te Pae – our new online portal.

2010/141: The code compliance of a fire safety system installed in a building

N/A

About this document

Standard order of documents checklist

Your building consent application should be clear, correct and complete, and include a suitable level of detail.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: