2017/026: Notice to fix issued in respect of a commercial laundromat

This determination was sought by the authority in regards to whether a notice to fix was correctly issued to the designer as a specified person, and whether the sprinkler system is a specified system for the purpose of the compliance schedule and building warrant of fitness.  The determination also considers the compliance of particular features of the building, and discusses the various contraventions listed in the notice to fix.

About this document

2019/028: Regarding the code compliance of parapet and post details without metal cap flashings to membrane decks

Explanatory note

This determination contained an error when it was issued on 26 June 2019. At Paragraph 5.6.6 it read, “I note here the torch-on-membrane, which the authority issued a building consent for (refer paragraph 4.5.1), is permitted within the Acceptable Solution as a capping material to parapets".

To provide clarity paragraph 5.6.6 is now to be read as follows, “I note here metal, butyl or EPDM membranes are the materials specified in the Acceptable Solution as capping materials to parapets. The authority issued a building consent (refer paragraph 3.7) for the torch on membrane, which established that the authority was satisfied with the compliance of that material as a weathertightness system."

This determination considers the compliance of parapet and...

About this document

The Building Amendment Bill has passed into law

Parliament has passed new legislation to support the use of new, innovative and efficient building methods, and improve trust and confidence in the building system.

2026/030: Compliance of a Unit without a Type 4 fire alarm system

This determination considers whether a two-level Unit, in an existing commercial building, would comply with the Building Code without a Type 4 alarm system.

The existing alarm system was installed as part of a building consent application, after an intermediate floor in the unit was enlarged in area. The determination considers whether the evacuation time allows occupants to move to a place of safety in the event of fire.

About this document

Seismic Review Steering Group Chair and members appointed

An independent Chair and steering group have been appointed to provide expert oversight for the review of seismic risk management in existing buildings.

Recording and reporting of non-compliance

How non-compliance with accreditation requirements is defined, recorded and reported.

Recording and reporting of non-compliance

How non-compliance with accreditation requirements is defined, recorded and reported.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: