Search

Search results

Showing 591-600 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

New dates for updating Building Code

The Building Code will updated annually from 2021, with consultation opening in April 2021 and amendments published in November 2021.

Acceptable Solutions & Verification Methods

The Simple House Acceptable Solution is for single storey framed construction using limited roof spans and claddings.

2021/021: Regarding the withdrawal of a notice to fix for a retaining wall, near the boundary with another property

This determination concerns a low retaining wall located near a boundary that was constructed without building consent, where a driveway was subsequently built near the top of the retaining wall on the neighbouring property. The determination considers whether the retaining wall was subject to a surcharge or load from vehicle traffic at the time of its construction, and whether the wall was exempt from the requirement for a building consent under Schedule 1 of the Building Act.

About this document

2018/063: Building Code compliance of the proposed location for large toilet paper dispensers in accessible public toilets

This determination considers the code compliance of large toilet paper dispensers installed in prefabricated public toilets - the location of the dispensers differs from that shown in the relevant Acceptable Solution.  The prefabricated toilets are built under a consent issued at the point of manufacture and relocated throughout the country using a separate buidling consent for the site installation.

About this document

2023/002: Regarding the compliance of a pool barrier located close to a property boundary with Clause F9

This determination considers whether a proposed pool barrier near a property boundary complies with Building Code Clause F9. The determination looks at the requirements of the Acceptable Solution F9/AS1 as it relates to pool barriers near property boundaries and whether future changes a neighbour maybe a factor when considering Building Code compliance of the pool barrier.

About this document

2022/010: The authority's refusal to grant a building consent for foundations, a deck, a roof structure, and the installation of a solid fuel heater

This determination considers whether the authority was correct to refuse to grant a building consent. The determination considers the authority's reasons for the refusal and whether sufficient information was included in the building consent application for the authority to be satisfied that the provisions of the Building Code would be met if the building work were properly completed in accordance with the plans and specifications under section 49 of the Building Act.

About this document

2017/005: Regarding the code compliance of remediation work to a 15-year-old house

This determination considers the authority’s reasons for refusing to issue a code compliance certificate for remedial work to an existing house; and whether the work concerned complied with Clause B1, B2, and E2 of the Building Code. The building consent had been issued with requirements for quality assurance in relation to construction monitoring which was also the subject of the dispute between the parties.

About this document

Regulation 7A – Inspection requirements

The policies and procedures that a BCA has in place concerning building work inspections must ensure that it meets the specified performance requirement.

Early childhood education centres

Some ways for Early Childhood Education and Care Centres to meet Building Act and Ministry of Education requirements.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: