Search

Search results

Showing 191-200 of 1000 results for BRANZ-CM-1002-Rev 1​
Sorted by relevancy

Acceptable Solutions & Verification Methods

G10 Piped services – G10/VM1, G10/AS1, another Acceptable Solution. First edition, Amendment 7.

C2 Prevention of fire occurring

Safe design and installation of fixed appliances using controlled combustion and other fixed equipment.

Glossary of terms and abbreviations

A glossary of the key terms and abbreviations that are relevant to the building consent authority accreditation scheme.

Seismic assessment of existing buildings

The Engineering Assessment Guidelines are used by engineers to carry out seismic assessments of existing buildings.

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people:

Print this page (recommended)

This will print only the current page of this guidance document.

Print this page

Cancel