Building Code compliance >
D Access >
5. Building entrances >
Design building entrances so that they are as easy to use as possible for a wide range of people.
Building Code compliance >
D Access >
6. Internal circulation >
Effective internal circulation is critical to the safe and easy movement of people around buildings.
Building Code compliance >
D Access >
7. Interior space >
Design interior spaces and facilities such as kitchens and toilets so they best meet the needs of users.
Building Code compliance >
D Access >
8. Fixtures and fittings >
Design and place fixtures and fittings such as seating, switches, controls and sanitary fittings in toilets so that they are easily accessed and used.
Building Code compliance >
D Access >
9. Building types >
Transport buildings, sports facilities, retail premises and historic buildings have particular issues affecting their use which need to be considered.
Building Code compliance >
D Access >
D2 Mechanical installations for access >
Acceptable Solutions & Verification Methods >
2nd edition, amendment 6 >
D2 Mechanical installations for access – D2/AS1, D2/VM1, D2/AS2, D2/AS3. Second edition, Amendment 6.
Building Code compliance >
D Access >
D2 Mechanical installations for access >
Acceptable Solutions & Verification Methods >
2nd edition, amendment 4 >
Building Code compliance >
D Access >
D2 Mechanical installations for access >
Acceptable Solutions & Verification Methods >
2nd edition, amendment 5 >
D2 Mechanical installations for access – D2/AS1, D2/AS2, D2/AS3. 2nd edition, Amendment 5. Effective 6 Jan 2002 - 14 Aug 2014
Building Code compliance >
D Access >
D2 Mechanical installations for access >
Acceptable Solutions & Verification Methods >
D2 Mechanical installations for access – D2/AS1, D2/VM1, D2/AS2, D2/AS3. Second edition, Amendment 6.