Building Code compliance >
C Protection from fire >
C1 Objectives of Clauses C2 to C6 >
Fire performance of external wall cladding systems - Revision 2: 2020 >
Introduction >
A suite of fire testing protocols can be used to assess performance against the New Zealand Building Code requirements.
Building Code compliance >
C Protection from fire >
C1 Objectives of Clauses C2 to C6 >
Fire performance of external wall cladding systems - Revision 2: 2020 >
New Zealand Building Code compliance pathways >
Summarises available compliance pathways for Building Code Clause C3 External spread of fire.
Building Code compliance >
C Protection from fire >
C1 Objectives of Clauses C2 to C6 >
Fire performance of external wall cladding systems - Revision 2: 2020 >
Timber within an external wall cladding system >
Intermediate and large scale tests or protective lining material to prevent charring for timber framing.
Building Code compliance >
C Protection from fire >
C1 Objectives of Clauses C2 to C6 >
Fire performance of external wall cladding systems - Revision 2: 2020 >
Resources for fire testing protocols of external wall cladding >
Useful resources and references for testing protocols to determine fire performance of external wall cladding systems.
Projects & consents >
Planning a successful build >
Scope and design >
Check if you need consents >
Building work that doesn't need a building consent >
Exempt building work guidance >
4. Plumbing and drainage >
4.1 Repair, maintenance, and replacement of sanitary plumbing and drainage >
A range of plumbing work can be done without a building consent as long as it's done by an authorised person.
Projects & consents >
Planning a successful build >
Scope and design >
Check if you need consents >
Building work that doesn't need a building consent >
Exempt building work guidance >
7. Platforms, decks and bridges >
This section includes building work for decks, platforms, bridges, boardwalks which will be accessible by the public. It also includes short-span bridges on private land, without public access.
Projects & consents >
Planning a successful build >
Scope and design >
Check if you need consents >
Building work that doesn't need a building consent >
Exempt building work guidance >
8. Shelters, shades and carports >
8.6 Ground floor awnings up to 20 sqm >
A building consent is usually not required to attach an awning to the ground-floor or first-storey level of a building.
Projects & consents >
Planning a successful build >
Scope and design >
Check if you need consents >
Building work that doesn't need a building consent >
Exempt building work guidance >
15. Network utilities >
This section includes certain structures owned or controlled by network utility operators or similar.
Projects & consents >
Planning a successful build >
Scope and design >
Check if you need consents >
Building work that doesn't need a building consent >
Exempt building work guidance >
13. Support structures >
This section includes construction of both small and large retaining walls. For large retaining wall removal, please see section 1.
Projects & consents >
Planning a successful build >
Scope and design >
Check if you need consents >
Building work that doesn't need a building consent >
Exempt building work guidance >
14. Other structures >
This section includes photovoltaic solar panel arrays in both urban and rural zones, outdoor fireplaces or ovens, temporary storage stacks and plinths.