Search

Search results

Showing 11-20 of 1173 results
Sorted by recency

Greenz Aluminium Windows and Doors

About this certificate

Owens Corning Asphalt Roofing Shingles

About this certificate

Architectural Wall Panels (AWP) and Evolution (EVO)

About this certificate

2023/038: The authority's decision to issue a notice to fix for weathertightness remedial work to a 17-year-old building

This determination considers the authority's decision to issue a notice to fix. The matter concerns alleged contraventions with Building Code clause E2 External moisture, building work carried out other than in accordance with a building consent, and the timeframe and remedies in the notice.

About this document

2023/037: The compliance of a waterproof membrane tanking system with Clause E2 of the Building Code

This determination considers whether the tanking system, applied to a blockwork retaining wall on a residential house, complies with the weathertightness requirements of Building Code clause E2 External Moisture.

About this document

2023/031: Decision by an authority to grant a building consent and issue a code compliance certificate for a relocatable dwelling

This determination considers the decision of the authority to grant a building consent and issue a code compliance certificate for a dwelling. The owner is of the view that several aspects of both the design and as-built construction do not comply with various clauses of the Building Code. The main issues relate to the weathertightness and stability of the dwelling.

About this document

Record of amendments – acceptable solutions, verification methods and handbooks (1992–2023)

Building Code compliance > How the Building Code works > Different ways to comply with the Building Code > Acceptable Solutions and Verification Methods > Record of amendments
Help for people needing a record of amendments to Acceptable Solutions, Verification Methods and handbooks since 1993.

2023/030: The issue of a building consent, specifically in regard to three cladding details

This determination considers a building consent for the construction of a dwelling. The matter concerns the details for fixing infill panels that were proposed to be installed above and below windows, and above a garage door and entrance. The determination considers whether those details, as documented in the consent application, would comply with clause E2 External Moisture and B1 Structure, if the building work was constructed in accordance with the building consent.

About this document

2023/027: The compliance with clause E2 of a proposed direct-fixed plywood cladding system on a building

This determination considers whether the proposed direct-fixed version of the plywood cladding system complies with Building Code Clause E2.3.2, specifically when considering the use of BRANZ Appraisal no 765 (2017) as evidence to show compliance. The scope of the appraisal requires a risk score of 0-6, as calculated in acceptable solution E2/AS1, and this determination assesses whether the proposed application falls within those bounds.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: