Acceptable Solutions and Verification Methods (AS and VMs) were called compliance documents. Some still have the “compliance document” title but the AS or VMs they contain are valid and unaffected by the name change.
C/AS4, amendment 3
Effective on 1 July 2014 until 30 May 2017
Overview
Acceptable Solution for Buildings with public access and educational facilities (Risk Group CA) for compliance with Building Code Clauses C1-C6 Protection from fire.
Scope of Acceptable Solution C/AS4 includes buildings or parts of buildings less than 20 storeys high within Risk Group CA, where people congregate, participate in group activities, or where personal services are provided. For example, certain theatres, shops, education centres and churches.